Crammond Park, Harlow

Client: Caisson Investment Management 

Surveyors: Derrick Wade Waters

Sector: Commercial

 

Project Value: £150,000

Duration: 8 Weeks

Project Overview

A warehouse built in approximately 1990 comprising a steel portal frame with a minimum eaves height of 6m and an electrically operated loading door. There is a large forecourt to the front of the property, offering 31 parking spaces and loading/unloading facilities. Crammond Park is a gated development of 4 similar units. Within each unit are two-storey office areas to the front elevation, incorporating staff facilities. 

  • Form and aperture between the units
  • Internal & external redecorations
  • Strip out and dispose of redundant mezzanine floors and partitions to leave open plan office spaces.
  • Installation of new boilers and air conditioning
  • Extensive electrical remedial works following testing
  • Liaising with tenants to ensure the works were carried out at a suitable time to them
  • Repairs to the existing ceiling grids and tiles
  • New carpets and flooring throughout
  • Installation of fire proofing throughout to ensure the property met Building Control Regulations