Glengall Business Centre, SE15
Contract Administrator: Palmer Glew
Sector: Industrial
Project Value: £35,000
Duration: 3 weeks
Project Overview
Strip-out and refurbishment of an 8,140 sq ft mid-terrace, light-industrial and office unit arranged over two floors, returning it to a fully lettable standard following the previous tenant’s vacation. The ground-floor warehouse benefits from a 4-metre roller-shutter door and a 4.5-metre clear floor-to-ceiling height, with first-floor offices set over a raised access floor and served by gas-fired central heating and air conditioning. Arden stripped out the tenant’s fixtures and fittings, capped off the remaining services, and carried out mechanical, electrical and life-safety repairs and certification, alongside cladding cleaning and a replacement warehouse roller-shutter door, to ready the unit for re-letting.
Works included:
Strip out all tenant-installed fixtures and fittings
Cap off remaining services
Electrical and mechanical repairs and certification
Emergency and temporary lighting
Cladding cleaning and repairs
Roller-shutter door replacement
Fire and security alarm and lighting repairs and certification
Approach / Key Challenges
A light-industrial unit returned to a lettable standard, combining a full strip-out with mechanical, electrical and life-safety repairs and certification, and replacement of the warehouse roller-shutter door.