Glengall Business Centre, SE15

Contract Administrator: Palmer Glew

Sector: Industrial

 

Project Value: £35,000

Duration: 3 weeks

Project Overview

Strip-out and refurbishment of an 8,140 sq ft mid-terrace, light-industrial and office unit arranged over two floors, returning it to a fully lettable standard following the previous tenant’s vacation. The ground-floor warehouse benefits from a 4-metre roller-shutter door and a 4.5-metre clear floor-to-ceiling height, with first-floor offices set over a raised access floor and served by gas-fired central heating and air conditioning. Arden stripped out the tenant’s fixtures and fittings, capped off the remaining services, and carried out mechanical, electrical and life-safety repairs and certification, alongside cladding cleaning and a replacement warehouse roller-shutter door, to ready the unit for re-letting.

Works included:

  • Strip out all tenant-installed fixtures and fittings

  • Cap off remaining services

  • Electrical and mechanical repairs and certification

  • Emergency and temporary lighting

  • Cladding cleaning and repairs

  • Roller-shutter door replacement

  • Fire and security alarm and lighting repairs and certification

Approach / Key Challenges

A light-industrial unit returned to a lettable standard, combining a full strip-out with mechanical, electrical and life-safety repairs and certification, and replacement of the warehouse roller-shutter door.