Nations House, W1
Contract Administrator: CBRE
Sector: Commercial
Project Value: £50,000
Duration: 8 weeks
Project Overview
Comprehensive strip-out of a 10,000 sq ft office floor on the fifth storey, returning the space to an open-plan landlord’s shell ready for re-letting. Arden removed the metal ceiling and grid, all tenant-installed access systems and cabling, and the fixtures and fittings — including kitchenettes, reception desks, partitions and carpets — and took the power, water and waste supplies back to the landlord’s supply. Floor boxes and cable trays were removed, the WCs stripped out, fire-stopping repaired, and temporary and emergency lighting installed.
Works included:
Remove and dispose of the metal ceiling and grid
Remove all tenant-installed access systems and associated cabling
Strip out fixtures and fittings, including kitchenettes, reception desks, partitions and carpets
Take back power, water and waste supplies to the landlord's supply
Remove floor boxes and cable trays
Strip out and remove all WCs
Repairs to fire-stopping
Temporary and emergency lighting
Approach / Key Challenges
A full Cat A strip-out returning an occupied office floor to an open-plan landlord’s shell, with services taken back to landlord supply and fire-stopping reinstated ready for re-letting.