Pump House Estate, SE16
Sector: Residential
Project Value: £40,000
Project Overview
Common parts residential refurbishment to the Pump House Estate, renewing decorations, floor coverings and ironmongery across multiple blocks.
Works included:
Internal decorations, carpeting to blocks 8-15 and 18-29, and Gallery acoustic vinyl to block 31-41
Replacement of ironmongery
Decorations to all previously painted surfaces, stonework, timber and railings
Timber repairs to handrails
New entrance matting
Extensive preparation of the softwood staircase for new Bona Traffic Anti-Slip polyurethane varnish
New floor coverings
Approach / Key Challenges
Works were phased across multiple blocks, with different floor coverings specified by block and the softwood staircases specially prepared for a Bona Traffic Anti-Slip polyurethane varnish to suit continued use by residents throughout.