St Davids Welsh Church, W2
Contract Administrator: Colliers International
Sector: Commercial & Retail
Project Value: £40,000
Duration: 4 weeks
Project Overview
Structural repair and rebuilding of the perimeter boundary wall to a former church building, on a self-contained site occupied by a language-school tenant. Arden excavated and installed new concrete pier foundations, repointed the full length of the wall, and constructed 15 new piers to prevent further leaning, all to the structural engineer’s specification and drawings. Electrical isolations and reinstatement, new copings and pier caps, jet-washing of the brickwork and protection to the existing surfaces and adjacent playground completed the works.
Works included:
Pier excavations and new concrete foundations
Full-length repointing of the wall
15 no. new piers to prevent further leaning, to the structural engineer’s specification
Electrical isolations and reinstatement
New copings and pier caps
Protection to existing surfaces and the playground area
Jet-washing of all brickwork
Approach / Key Challenges
A structural stabilisation of a leaning boundary wall on an occupied site, underpinned with new foundations and piers to the engineer’s design, with the adjacent playground protected throughout.