The Bloomsbury Hotel

Contract Administrator: Cogent BC

Sector: Commercial

 

Project Value: £60,000

Duration: 4 weeks

Project Overview

Roof repairs to the 7th and 8th floors of an operational hotel in Bloomsbury, London. The works were carried out over 4 weeks while the hotel continued to trade without interruption.

Works included:

  • Patch repairs to multiple roof areas

  • Design and installation of a new drainage route

  • Repair and redress of a detached single-ply membrane

  • Removal of defective flashband

  • Supply and installation of single-ply patch repairs to selected roof covering areas

Approach / Key Challenges

The hotel remained fully operational throughout the works. Roof repairs were sequenced to maintain a watertight covering across the affected areas at all times, avoiding disruption to hotel operations below.